WhatsApp / Tel: +86 15262904857    E-mail: Jsbeileivip@163.com

JIANGSU BAILEY 

STEEL BRIDGE

You are here: Home / Products / Compact 321 Bailey Bridge / Compact 321 / Temporary Steel Bridge Manufacture Cheap Prefabricated Compact Steel Bridge

Product Category

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Temporary Steel Bridge Manufacture Cheap Prefabricated Compact Steel Bridge

Standard:                         ASTM,GB
Material Grade:               Q355B-Q460C
Place of Origin:                Jiangsu,China
Product Name:                Bailey Steel Bridge
Model Number:                JSBLGQ-ZB200(321)
Tolerance:                         土1%
Production Capacity:      2500 Tons per month
Packing Detail:                Cargo in bundle
Payment Mode:               TT (Telegraphic Transfer)
Port of Loading:              Any port in China,usually
Shanghai Port
Availability:
Quantity:
  • CB100(CB321)Bailey Bridge

  • BAILEY

                                    Construction stage

                                               --------------------------------------▶▶▶--------------------------------------

Ecological protection:

During the construction process, efforts should be made to minimize damage to the surrounding vegetation and ecological environment. For example, measures should be taken to prevent sediment loss and water pollution during construction in river channels; When construction is carried out near residential areas or ecologically sensitive areas, the construction time and noise should be arranged reasonably to reduce the impact on surrounding residents and the ecological environment.

Emergency plan: 

In the event of typhoons, floods, or other natural disasters, all construction machinery and workers should be evacuated. Necessary measures should be taken to ensure the safety of completed steel bridges to avoid construction accidents and secondary pollution to the environment caused by natural disasters.


  Project parameters

                                   --------------------------------------▶▶▶--------------------------------------

Type Type 321 Bridge Form Double row single layer reinforced
Length 108m (21.6m/spanx5span) Load 40T
Net width 4m Security Set up pedestrian guardrail net and curb
Process The pier is supported by steel tube structure Steel Structure The pier is 630x10mm steel pipe structure


                                   Case presentation

                                                    --------------------------------------▶▶▶--------------------------------------

Qin Huai River in Nanjing,iangsu provinceShifiu Lake in Lishui district. Pengfu,Jiangning districtChannel improvement and construction project

Qin Huai River in Nanjing,iangsu provinceShifiu Lake in Lishui district.  

未标题-1_01未标题-1_02未标题-1_03




Previous: 
Next: 

Related Products

CONTACT US INQUIRE NOW

JIANGSU BAILEY STEEL BRIDGE

WhatsApp / Tel: +86-15262904857
WhatsApp / Tel: +86-13655289012
FAX: +86-511-88881212
QQ: 2850956851 / 2850603232

QUICK LINKS

CATEGORIES

CONTACT US INQUIRE NOW
Copyright  2024 Jiangsu Bailey Steel Bridge Co, LTD.  SitemapPrivacy Policy