Availability: | |
---|---|
Quantity: | |
CB100(CB321)Bailey Bridge
BAILEY
Overview
--------------------------------------▶▶▶--------------------------------------
Product Details
Standard: ASTM, BS, GB Grade: Q345B-Q460C
Place of Origin: Jiangsu, China Brand Name: BAILEY
MOQ: 1 PC Delivery Time: 15-21 days
Application: Steel Structure Bridge Packing: 40' standard HQ containers
supply Ability: 10000.0 Ton/Tons per Year
Payment: L/C, T/T, ESCROW
Port of Loading: Any port of China, main port is Shanghai port
ZB321(100) truss press limited table | |||||||||
No. | internal force | structure form | |||||||
not reinforced model | reinforced model | ||||||||
SS | DS | TS | DDR | SSR | DSR | TSR | DDR | ||
321(100) | standard truss moment(kN.m) | 788.2 | 1576.4 | 2246.4 | 3265.4 | 1687.5 | 3375.0 | 4809.4 | 6750.0 |
321(100) | standard truss shear (kN) | 245.2 | 490.5 | 698.9 | 490.5 | 245.2 | 490.5 | 698.9 | 490.5 |
321 (100) Table of geometric characteristics of truss bridge(Half bridge) | |||||||||
Type No. | Geometric characteristics | structure form | |||||||
not reinforced model | reinforced model | ||||||||
SS | DS | TS | DDR | SSR | DSR | TSR | DDR | ||
321(100) | Section properties(cm3) | 3578.5 | 7157.1 | 10735.6 | 14817.9 | 7699.1 | 15398.3 | 23097.4 | 30641.7 |
321(100) | Moment of inertia(cm4) | 250497.2 | 500994.4 | 751491.6 | 2148588.8 | 577434.4 | 1154868.8 | 1732303.2 | 4596255.2 |
R&d and Innovation
--------------------------------------▶▶▶--------------------------------------
Jiangsu Bailey Steel Bridge Co.,Itd.is a specialized Steel bailey bridge manufacturers with leading manufacturing
process and R& D team for Steel bailey bridges in China,who has been engaging in this line for nearly 20years with an international Quality System Certification of ISO9001:2008 and SGS certification as the cooperation partner with the research institutions of the People's Liberation Army and Road Bridge and River-crossing Engineering Department of Nanjing University of Science & Technology.
bridge new product R&D test Bailey
Shanghai
Bailey bridge(ZB-321,deck-type)for Shanghai No.5 ditch project to Shanghai Hydraulic Engineering Group Co.,LTD.
Shanghai
Shanghai
Multi-lanes Bailey bridge,Chuansha county,Shanghai city type200.
Cast-in-situ bailey bridge for support to Shanghai 2nd
Construction Co.,LTD type200.
Product Process
--------------------------------------▶▶▶--------------------------------------
①
Raw Material
②
Sawing
③
Cutting
④
Shearing
⑤
Bending
⑥
Punching
⑦
Drilling
⑧
Welding
⑨
Surface Treatment
⑩
Semi-finished products
⑪
Painting
⑫
Finished products
International Vision
--------------------------------------▶▶▶--------------------------------------
2006Year | The company was solemnly established and participatedin the construction of Sichuan Niangyong and Banduo Hydropower Projects in the same year. |
2007Year | Shanghai Construetion Engineering Beicai Municipal (overnment and Taizhou River Crossing Bridge. |
2008Year | The Ministry of Foreign Tradewas established,CambodiaGianzai Hydropower Station and the domestic Shanwei-Xiamen-ShenzhenRailway. |
2009Year | Participated in the elevate support of the Shanghai Jiangong Shangnan RoadInterchange at the WorldExpo and the GuoyangLaozi Temple LandscapeBridge in Anhui. |
2010Year | Participation in the construetion of Cambodia's Elezhai Hydropower Station and Stenwodai Hydropower Station and the steel bridge project of Qinghai Xunhua Hydropower System. |
2011Year | The Wenchuan Earth quakeassisted in the construetion of the export of steelbridges to lrag. |
2012Year | Henan Zhengzhou FoxconnTraffie Bridge, Sichuan Xixihe Hydropower Station Lhasa Bangduo Hydropower Station Steel Bridge Proiect. ete. |
2013Year | Angola and OuterMongolia steel bridge export tasks and Xiningand Tianjin steel bridge projects. |
2014Year | Philippine exports and the construction of Shangri-LaYunnan in Hotan, Xinjiang 67-meter pipeline bridge inFengxiang,Shanxi,and137-meter steel bridge inYancheng China Railway. |
2015Year | Singapore Super Bere Bridge,Nepal,Guatemala.India Patel 180-meter bronze statue construction 225-meter steel bridge and other projects. |
2016Year | Congo Golden Steel Bridge Export,Shanghai Bao steel Xinjiang Kanas ForestryBureau,Zhenjiang Wetland Park Steel Bridge Project,Sanya Hongtang Airport 10.000-pile Bere Tablet Project started. |
2017Year | Changzhou Longhutang Metro Station Metro Line 2 Beirejia Steel Bridge Projeet in Zhaosu County,Atushi. Hemu County,Xinjiang,Bozhou, Anhui. |
2018Year | The Philippines and Nepal Shangma xiangdi Hydropower Station, and the Hidalaya Third Bridge Steel Bridge Project in Bangladesh. |
2019Year | Shandong China Railway16 steel bridges in Beitun,Xinjiang, Shihezi pipegallery bridge, Shantou support,etc.,exported toIndonesia. |
2020Year | Sangyuanzi Bridge across the Yellow River in Lanzhou.Gansu.Sichuan Road Bridge200 type deck full-heights hear-resistant Bailey Bridge,Xinjiang Horgos steel bridgeproject, Linzhi, Tibet, ete. |
2021Year | What will Jiangsu Bailey Steel Bridge Co.. Ltd. look like in the future? Please look for ward to it. |
Qualification Certificate
--------------------------------------▶▶▶--------------------------------------
Warehousing and shiping
--------------------------------------▶▶▶--------------------------------------
Service flow
--------------------------------------▶▶▶--------------------------------------
Customer Service Phone number of the Jiangsu Bailey Steel Bridge Co.,Ltd. |
The customer service representative can provide you with professional advice and explicit explanation. |
We can arrange for an excellent engineer to keep in close touch with you at all times to your exact requirements. |
Our engineer can explain in detail how to use the products while providing you with the necessary service. |
Our engineer will conduct a thorough inspection of the bridge products and any problem which arises in theprocess would be solved. |
The feedback on your service information will get to our company's service center. |
Jiangsu Bailey Steel Bridge will follow up your business on the online service platform to ensure your satisfaction. |
FAQ
--------------------------------------▶▶▶--------------------------------------
What kind of company are you? | |
☺ | We are a specialized steel bailey bridge manufacturer with leading manufacturing process for steel bailey bridges in China, who has engaged in this line for over 20 years with an international Quality System Certification of ISO9001:2015 and as cooperation partner with the research institutions of the People's Liberation Army. In addition to this, have good market reputation overseas, like Nigera, Angola, Cango, Cambodia, Nepal, Venezuela, Vietnam, Bangladesh, Papua new guinea, Columbia...... |
Are you a factory or a trade company ? | |
☺ | We are a factory with Six production lines and various machines to fabricate steel bridges parts and other steel structures. Also, we have gotten the exporting license to devote ourselves into global markets. |
How about quality control of your company? | |
☺ | We pay great attention on quality control from the beginning to the end,keeping our goods to meet the standards of CMA,CNAS,ISO9001,Grade I road,Grade A urban road,Amercia loading standard HS25 and British loading standard HA. |
Where is your loading port? | |
☺ | Any port in China, the main port is Shanghai port . |
Overview
--------------------------------------▶▶▶--------------------------------------
Product Details
Standard: ASTM, BS, GB Grade: Q345B-Q460C
Place of Origin: Jiangsu, China Brand Name: BAILEY
MOQ: 1 PC Delivery Time: 15-21 days
Application: Steel Structure Bridge Packing: 40' standard HQ containers
supply Ability: 10000.0 Ton/Tons per Year
Payment: L/C, T/T, ESCROW
Port of Loading: Any port of China, main port is Shanghai port
ZB321(100) truss press limited table | |||||||||
No. | internal force | structure form | |||||||
not reinforced model | reinforced model | ||||||||
SS | DS | TS | DDR | SSR | DSR | TSR | DDR | ||
321(100) | standard truss moment(kN.m) | 788.2 | 1576.4 | 2246.4 | 3265.4 | 1687.5 | 3375.0 | 4809.4 | 6750.0 |
321(100) | standard truss shear (kN) | 245.2 | 490.5 | 698.9 | 490.5 | 245.2 | 490.5 | 698.9 | 490.5 |
321 (100) Table of geometric characteristics of truss bridge(Half bridge) | |||||||||
Type No. | Geometric characteristics | structure form | |||||||
not reinforced model | reinforced model | ||||||||
SS | DS | TS | DDR | SSR | DSR | TSR | DDR | ||
321(100) | Section properties(cm3) | 3578.5 | 7157.1 | 10735.6 | 14817.9 | 7699.1 | 15398.3 | 23097.4 | 30641.7 |
321(100) | Moment of inertia(cm4) | 250497.2 | 500994.4 | 751491.6 | 2148588.8 | 577434.4 | 1154868.8 | 1732303.2 | 4596255.2 |
R&d and Innovation
--------------------------------------▶▶▶--------------------------------------
Jiangsu Bailey Steel Bridge Co.,Itd.is a specialized Steel bailey bridge manufacturers with leading manufacturing
process and R& D team for Steel bailey bridges in China,who has been engaging in this line for nearly 20years with an international Quality System Certification of ISO9001:2008 and SGS certification as the cooperation partner with the research institutions of the People's Liberation Army and Road Bridge and River-crossing Engineering Department of Nanjing University of Science & Technology.
bridge new product R&D test Bailey
Shanghai
Bailey bridge(ZB-321,deck-type)for Shanghai No.5 ditch project to Shanghai Hydraulic Engineering Group Co.,LTD.
Shanghai
Shanghai
Multi-lanes Bailey bridge,Chuansha county,Shanghai city type200.
Cast-in-situ bailey bridge for support to Shanghai 2nd
Construction Co.,LTD type200.
Product Process
--------------------------------------▶▶▶--------------------------------------
①
Raw Material
②
Sawing
③
Cutting
④
Shearing
⑤
Bending
⑥
Punching
⑦
Drilling
⑧
Welding
⑨
Surface Treatment
⑩
Semi-finished products
⑪
Painting
⑫
Finished products
International Vision
--------------------------------------▶▶▶--------------------------------------
2006Year | The company was solemnly established and participatedin the construction of Sichuan Niangyong and Banduo Hydropower Projects in the same year. |
2007Year | Shanghai Construetion Engineering Beicai Municipal (overnment and Taizhou River Crossing Bridge. |
2008Year | The Ministry of Foreign Tradewas established,CambodiaGianzai Hydropower Station and the domestic Shanwei-Xiamen-ShenzhenRailway. |
2009Year | Participated in the elevate support of the Shanghai Jiangong Shangnan RoadInterchange at the WorldExpo and the GuoyangLaozi Temple LandscapeBridge in Anhui. |
2010Year | Participation in the construetion of Cambodia's Elezhai Hydropower Station and Stenwodai Hydropower Station and the steel bridge project of Qinghai Xunhua Hydropower System. |
2011Year | The Wenchuan Earth quakeassisted in the construetion of the export of steelbridges to lrag. |
2012Year | Henan Zhengzhou FoxconnTraffie Bridge, Sichuan Xixihe Hydropower Station Lhasa Bangduo Hydropower Station Steel Bridge Proiect. ete. |
2013Year | Angola and OuterMongolia steel bridge export tasks and Xiningand Tianjin steel bridge projects. |
2014Year | Philippine exports and the construction of Shangri-LaYunnan in Hotan, Xinjiang 67-meter pipeline bridge inFengxiang,Shanxi,and137-meter steel bridge inYancheng China Railway. |
2015Year | Singapore Super Bere Bridge,Nepal,Guatemala.India Patel 180-meter bronze statue construction 225-meter steel bridge and other projects. |
2016Year | Congo Golden Steel Bridge Export,Shanghai Bao steel Xinjiang Kanas ForestryBureau,Zhenjiang Wetland Park Steel Bridge Project,Sanya Hongtang Airport 10.000-pile Bere Tablet Project started. |
2017Year | Changzhou Longhutang Metro Station Metro Line 2 Beirejia Steel Bridge Projeet in Zhaosu County,Atushi. Hemu County,Xinjiang,Bozhou, Anhui. |
2018Year | The Philippines and Nepal Shangma xiangdi Hydropower Station, and the Hidalaya Third Bridge Steel Bridge Project in Bangladesh. |
2019Year | Shandong China Railway16 steel bridges in Beitun,Xinjiang, Shihezi pipegallery bridge, Shantou support,etc.,exported toIndonesia. |
2020Year | Sangyuanzi Bridge across the Yellow River in Lanzhou.Gansu.Sichuan Road Bridge200 type deck full-heights hear-resistant Bailey Bridge,Xinjiang Horgos steel bridgeproject, Linzhi, Tibet, ete. |
2021Year | What will Jiangsu Bailey Steel Bridge Co.. Ltd. look like in the future? Please look for ward to it. |
Qualification Certificate
--------------------------------------▶▶▶--------------------------------------
Warehousing and shiping
--------------------------------------▶▶▶--------------------------------------
Service flow
--------------------------------------▶▶▶--------------------------------------
Customer Service Phone number of the Jiangsu Bailey Steel Bridge Co.,Ltd. |
The customer service representative can provide you with professional advice and explicit explanation. |
We can arrange for an excellent engineer to keep in close touch with you at all times to your exact requirements. |
Our engineer can explain in detail how to use the products while providing you with the necessary service. |
Our engineer will conduct a thorough inspection of the bridge products and any problem which arises in theprocess would be solved. |
The feedback on your service information will get to our company's service center. |
Jiangsu Bailey Steel Bridge will follow up your business on the online service platform to ensure your satisfaction. |
FAQ
--------------------------------------▶▶▶--------------------------------------
What kind of company are you? | |
☺ | We are a specialized steel bailey bridge manufacturer with leading manufacturing process for steel bailey bridges in China, who has engaged in this line for over 20 years with an international Quality System Certification of ISO9001:2015 and as cooperation partner with the research institutions of the People's Liberation Army. In addition to this, have good market reputation overseas, like Nigera, Angola, Cango, Cambodia, Nepal, Venezuela, Vietnam, Bangladesh, Papua new guinea, Columbia...... |
Are you a factory or a trade company ? | |
☺ | We are a factory with Six production lines and various machines to fabricate steel bridges parts and other steel structures. Also, we have gotten the exporting license to devote ourselves into global markets. |
How about quality control of your company? | |
☺ | We pay great attention on quality control from the beginning to the end,keeping our goods to meet the standards of CMA,CNAS,ISO9001,Grade I road,Grade A urban road,Amercia loading standard HS25 and British loading standard HA. |
Where is your loading port? | |
☺ | Any port in China, the main port is Shanghai port . |